M-E ENGINEERS
MECHANICAL AND ELECTRICAL
CONSULTING ENGINEERS
HOME
FIRM PROFILE
PORTFOLIO
   Comissioning
   Central Plants
   Civic
   Design Build
   Education
       K-12
       College &        Universities
   Healthcare
   Historic Preservation
   Hospitality
   Laboratories
   Lighting
       Electrical        Distribution
       Lighting Design
   Sustainable Design
   Urban Design & Mixed Use
NEWS
CAREERS
CONTACT US

CENTRAL PLANTS
Click here for a PDF file of this page.
ADDITIONAL PROJECTS
•Chiller Plant Upgrade – UCSD Medical Center
•Renovation of Central Plant- County of San Diego Operations Center
•Thermal Energy Storage- California Institute of Technology,
Pasadena, CA
•Cooling Tower Replacement, University of California – Los Angeles
•New Central Plant, County Operations Center - San Diego, CA
•Central Plant Upgrade, Mercy Hospital - San Diego, CA
SATELLITE PLANT & UTILITY SYSTEMS UPGRADE
University of California, Riverside

Major upgrade and expansion of the Central Utility Systems for the UCR campus. The Project phases included a 2.4 million gallon TES Tank, two 2,000 ton electric chillers, cooling towers, electrical systems and associated distribution pumps, a new 10,000 square foot Satellite Plant building, a 7,200 LF of chilled water distribution piping, a 5,000 LF of 12 kV power distribution, a 3,000 LF of steam distribution, and chilled water piping modifications to several buildings.
CENTRAL PLANT (CP3) EXPANSION
University of California, San Diego

Expansion of the Central Utilities Plant (CUP) at UCSD. The CUP consists of two 13 MW gas turbine generators with HRSG’s, 10,000 tons steam turbine chillers, 4,200 tons electric chillers, 200,000 pounds per hour steam boilers, 4,500 KW diesel generators, HTHW heat exchangers, 72,000 gpm cooling towers and associated distribution pumps.
TES SYSTEM & CENTRAL PLANT
California State University, Pomona

Provided the design and construction of a new 6,000 ton chilled water central plant and chilled water distribution piping.
KERN COUNTY MEDICAL CENTER CENTRAL PLANT
Bakersfield, California

M-E was the prime consultant for the feasibility study and design of a new central chiller water and boiler plant.
COGENERATION & UTILITY SYSTEMS IMPROVEMENTS
San Diego State University, California

Provided conceptual design and analysis of the 12 MW gas fired cogeneration plant to serve SDSU’s campus as Engineer of Record for Design Build Contractor.
R.W. JOHNSON PHARMACEUTICAL RESEARCH FACILITY NEW
CENTRAL PLANT
La Jolla, California

Provided mechanical and electrical design for a new chiller and boiler plant.