HEALTHCARE
ADDITIONAL
PROJECTS
| Mission Bay Hospital- San Diego, CA |
| Veterans Affairs Medical Center – Loma Linda, CA |
| Alvarado Hospital – San Diego, CA |
| Sharp Healthcare – San Diego, CA |
| Grossmont Hospital – La Mesa, CA |
| Corona Regional Medical Center – Corona, CA |
| Kaiser Permanente, Various Projects – San Diego, CA |
| Mercy Hospital & Medical Center – San Diego, CA |
| St. Mary’s Desert Hospital – Apple Valley, CA |
| Thornton Medical Center – San Diego, CA |
UCSD MEDICAL CENTER
MECHANICAL CENTRAL PLANT RENOVATION
San Diego, California
M-E provided the Commissioning Services, mechanical and electrical design services for the renovation of the central steam and chilled
water plant and thermal energy storage system.
UCSD MEDICAL CENTER
CLINICAL TEACHING FACILITY
San Diego, California
M-E provided mechanical and electrical engineering services for the renovation of this 150,000 square foot three-building, including replacement of existing air handling units and exhaust fans with new air handling units, variable speed drives, direct digital controls, and replacement of lighting fixtures.
KERN COUNTY MEDICAL CENTER CENTRAL PLANT
Bakersfield, California
M-E was the prime consultant for the feasibility study and design of a new central chiller water and boiler plant.
VETERANS AFFAIRS MEDICAL CENTER
La Jolla, California
Medical Air Compressors Replacement.
Cardiac Cath Lab Remodel, VAMC La Jolla
PALOMAR POMERADO HOSPITAL
San Diego, California
Pomerado Hospital – Improvements at this facility includes nearly 90,000 SF of remodeling in the existing hospital, a new 130,000 SF new hospital addition, 25,000 SF Diagnostic & Testing expansion, renovated central plant and extensive sitework.
Palomar (West) Hospital –Phase I scope includes site utility planning, a 10 level, 725,000 SF 450-bed hospital, a 4 level, 150,000 SF Women’s Center and new central utility plant to accommodate the building. The facility will emphasize sustainable features consistent with those for LEED Certification.